I am currently working as Assistant Manager/EngineerIII at cherat cement company limited in Electrical Maintenance department.
Education
-
2013 - 2017
University Of Engineering and Technology Peshawar
BSc Electrical Engineering
Experience
-
2018 - 2018
Askari Cement limited Nizampur
Internee
• Learned process flow of every area.
• Learned maintenance procedures of Electrical equipment.
• Uploading of daily maintenance report on PMMS.
• Bill calculation and kwh reporting from grid station. -
2018 - Present
Cherat Cement Company Limited
Engineer III/ A.M
• Implemented regularly scheduled testing, maintenance, and preventative maintenance of electrical Equipment (Variable frequency drives, LV and MV motors, transformers, Relays, electrostatic precipitator etc.) to ensure smooth plant operation.
• Designed and implemented Maintenance Plan of plant for monitoring and enhancing maintenance procedures to increase equipment effectiveness in addition to applying and improving the Preventive maintenance (PM).
• Performed on-site field surveys and wrote technical narratives to document processes and design changes.
• Conducted research to test and analyze feasibility, design, operation and performance of equipment, components and systems.
• Working on SAP Software to manage maintenance activities of plant.
• Worked on Motor Control Unit DCM-621E and enabled definite time protection on all MCUs to ensure motor safety.
• Formation of Root cause analysis reports for electrical equipment failure
• Creating maintenance plans to decrease mean time between failures
• Managed design and manufacturing teams to build proprietary process equipment within aggressive cost and time constraints.
• logic changes, simulation and modification in Siemens s7-400, 1200, 300 and 1500 using Simatic Manager and TIA portal.
• Process Control changes in Simatic WinCC.
• Understanding of Hardware Topology of DCS Process Mimic Diagrams in Simatic WinCC.
• Faults Troubleshooting and doing RCA using PCS 7.