About Muhammad Jahangeer Khan
Only For Ex-ServiceMan
-
Viewed 157
Education
- 2003
- 2006
-
2012
COMSATS institute of information technology
BS Electronics Engineering
Got CGPA 2.69 percentage 71.14%
Experience
-
2019 - Present
FESPAK Engineering Solutions Pvt Ltd
Project Engineer
Position: Project Engineer
Name of firm: FESPAK Engineering Solutions
Work Experience: Start from Nov 2019 to till date
Project Detail Shifting of WHR (waste Heat recovery) Power system in Lucky Cement Plant
From old site to new site.
Shifting of steem turbine and Generator.
Dismantling all panels HT, LV, VFD, DCS, PLC,UPS and CCR panels and installed to
new site
RO plant shifting and reinstallation
Boiler AQC and SP panels shifted to new site.
Responsibilities:
Daily tool box meeting Assigning Task to supervisors and laborers.
Daily Progress Reporting
Resolving Technical issues occurs on site relating to control and power.
Understand all Drawings of Control wiring and power.
Hands on Experience in Panels Termination, Dressing and loop testing.
HT termination and phase sequence testing. -
2017 - 2019
Huawei Technologies Pvt Ltd
NOC Engineer
Position: Team Leader & NOC Engineer
Name of firm: Andromeda (work under Huawei technology Pvt Ltd)
Work Experience: Start from 20 March 2017 to oct 2019
Responsibilities:
Work on software (OWS, U2000)
Work on Sites to activate 2G on mini sites.
Working in Moblink and ufone NOC (network operation center) monitoring Alarms
on sites by using software U2000. -
2013 - 2017
SCOMI Oil Tools Ltd
Site Supervisor
Position: Site Engineer
Name of firm: SCOMI Oil Tools Ltd (oil and gas field services Pak Branch)
Work Experience: Duration (5 july 2013 to 1 nov 2016)
Reason of leaving: International oil crises (no more projects)Responsibilities:
Electrical Work at Scomi Yard Pakistan and Oil and Gas RIG sites: Single Phase three phase wiring (open and underground)
DB ( Distribution board ) panels maintenance
Three phase panels maintenance
DOL Starter wiring & troubleshooting
Star Delta Starter wiring & troubleshooting
Reverse Forward panels wiring & troubleshooting
DOL starter using PLC
VFD (variable frequency drive) Centrifuge P.L.C Connection
Manual Safety switch connection with DOL panel.
Connections and testing of 3 phase motors.( star and delta connected).
Installation of two way selector switch for WAPDA and GENERATOR Supply.
Battries maintenance of solar system
Maintenance and operation of centrifugal pumps.
I have done HSE trainings (firefighting, emergency response training, rigging and slinging course, H2S, First Aid)
Know how about SCM (supply chain management) system.
Worked as yard supervisor and store incharge in the firm for duration of one year
Honors & awards
-
2018
PLC
Done three month training from Rawalpindi institute of information technology Operate DOL and Star Delta Starter through PLC